Water Services Sydney

Sydney Water Accredited Water Servicing Coordinator, Designer and Civil Project Manager

LP Consulting is a Sydney Water CBD Satellite office of Greg Houston Plumbing Pty Ltd who is a Licensed Water Servicing Coordinator. Mr Louis Panagopoulos has provided expert advice on a wide range of Sydney Water related matters since 1988. A synopsis of Louis’s experience is listed below:

The Service and Expertise:-
  • 1989 to 1994 — Sydney Water Registered Design Consultant for Dollar contracts
  • 1994 to 2004 — Sydney Water Designer and Quality Checker
  • 2004 to 2013 – Sydney Water Water Servicing Coordinator
  • 2004 to 2013 — Sydney Water Project Manager & Design Consultant
  • 2001 to 2013 — Hunter Water Accredited Design Consultant
  • 1994 to 2013 – ACTEW AGL Registered Designer and Project Manager
  • 2004 to 2013 — Accredited in Occupation Health and Safety

LP Consulting provides Water Servicing Coordination, Design and Project Management for small and large assets categories upto and including Steel pipelines.

The Types of Infrastructure Services and Categories include:-
  • Water Pipeline Extensions
  • Water Pipeline Amplifications and Renewals
  • Sewer Pipeline Extensions
  • Sewer Pipeline Adjustments
  • Sewerage Pumping Stations
  • Detailed Applications for a Notice of Requirements letter under Section 73 of the Sydney Water Act
  • Building Plan Approval
  • Water and Sewer Strategy reports and expert advice
OBTAIN A NOTICE OF REQUIREMENTS UNDER SECTION 73 OF THE SYDNEY WATER ACT

You the Developer will generally be required by Local Councils in Sydney to obtain a Notice of Requirements letter from Sydney Water under Section 73 of the Sydney Water Act. This requirement will be listed in your Local Council Development Consent Conditions of approval.

LP Consulting will apply to Sydney Water on your behalf and will require the following information:-

  • The Local Council Development Consent Conditions
  • A survey plan of the site
  • A Plan of Subdivision if applicable
  • Occupancy information including usage and population information

We will prepare the Application with all the available information and lodge this application electronically to Sydney Water via E Developer.

LP Consulting will be charged a fee by Sydney Water but you the Developer will only pay one fee amount to LP Consulting which will cover all costs including Sydney Water costs.

Sydney Water will then issue a Section 73 Notice of Requirements to LP Consulting which will be provided to you, the Developer for your records.

We process your application efficiently and provide answers to all your questions throughout the process.

Please contact LP Consulting on +61 416 256 955 or louis@lp-consulting.com.au24/7 to obtain any information you require in relation to the process of obtaining a Sydney Water Section 73 Notice of Requirements letter.

SYDNEY WATER BUILDING PLAN APPROVAL

LP Consulting will provide you the Developer with a FULL service ranging from the following services:-
  • Accepting your enquiry and offering advice immediately on the phone
  • Prompt on the spot service
  • Receiving all the necessary drawings and documents including the Development Application Consent Conditions
  • Obtaining a Services Protection Report
  • Review of Structural drawings
  • Review of Architectural drawings
  • Technical advice for difficult cases
  • Consultation with your Builder as required
  • Consultation with Sydney Water
  • Applications for Out of Scope Stormwater drains
  • Applications for Out of Scope Water mains
  • Applications for Out of Scope Sewer mains greater than DN300mm diameter including Carrier and Submain sewers
  • Applications for complex works
  • Coordination and showing the relevant Sydney Water water, sewer or stormwater main on the drawings
  • Stamping of Building Plans within one (1) day or overnight, of receiving all information
  • Completion of all the necessary Certification and forms
  • Submission of a FULL package to Sydney Water for approval

We process your Building Plan Approval efficiently and provide answers to all your questions throughout the process.

Please contact LP Consulting on +61 416 256 955 or louis@lp-consulting.com.au 24/7 to obtain any information you require in relation to the process of obtaining Sydney Water STAMPING of your Building Plans.

MAJOR WORKS DESIGN AND PROJECT MANAGEMENT

We provide innovative design solutions particularly for complex projects a full range of past projects completed by Louis on behalf of many consultants can be found by following the following link: CLICK HERE

We provide you with the following mandatory Sydney Water Design and Project Management services:-
  • Site Dial Before Your Dig
  • Verification of Utility Services
  • Design Plan and Longitudinal Sections for Water Mains
  • Design Plans and Longitudinal Sections for Sewer Mains
  • Design Plans and Longitudinal Sections for Stormwater Mains
  • Design Development Checklist
  • Inspections and Test Plans
  • Catchment Analyses or Sewer and Stormwater
  • Review of Environmental Factors reports
  • Flow Isolations and Flow Management Plans for Water, Sewer and Stormwater
  • Notices to Sydney Water during the Design and Constructions phases
  • Construction attendance and Construction Quality Control
  • Work As Executed drawings
  • Certification

LP Consulting provides Water Servicing Coordination, Design and Project Management that brings results to our Clients particularly for complex projects. We engage with our Clients and Sydney Water early in the project and negotiate outside the square to achieve real and effective solutions.

logo
touch
  • director

    Principal Engineer Louis Panagopoulos

    EMAIL louis@lp-consulting.com.au

  • PHONE +61 416 256 955

  • BUSINESS HOURS 8.30am - 5.00pmMonday – FridaySaturday, Sunday After Hours - By appointment

Menu
×
Menu