Surveyors measuring pipe levels for Sydney Water WAE drawings by LP Consulting.

Sydney Water Work-As-Executed (WAE) Drawings: What They Are and Why They’re Required

Work-As-Executed (WAE) drawings show the water, wastewater, recycled water or Sydney Water stormwater infrastructure actually installed on a site, including its final position, levels and pipe details. Sydney Water calls these records Work-As-Constructed (WAC) drawings and recognises WAE as another name for the same documentation. For developers and builders, WAE drawings are part of completing…

Engineer reviewing water and sewer plans for a Sydney Water Section 73 Certificate prepared by LP Consulting Australia.

What Is a Sydney Water Section 73 Certificate and When Do You Need One?

For many developments, the surprise comes in the approval conditions. A subdivision, dual occupancy, townhouse or commercial project may be required to obtain a Sydney Water Section 73 Certificate before it can move smoothly toward construction, registration, occupation or final sign-off. A Section 73 Certificate, formally known as a Section 73 Compliance Certificate, confirms that…

Engineering consultant preparing construction and development project documentation

Civil Engineering Consultants: What Service Do They Provide for Development Projects?

Engineering risk often appears after drawings look settled. A pipe alignment, flood level, easement, basement excavation or water authority requirement can move a footprint, change a level or add asset-protection work. Civil engineering consultants help turn a planning idea into a buildable project by identifying the engineering questions that need answers before a design hardens.…