GEORGE STREET, LEICHARDT

Background: The brief was that an infrastructure upgrade and the best outcome for handling the large stormwater drain that was traversing the site was required.
Strategy: Applicable requirements were obtained from Sydney Water via applications for servicing and adjustment.
Solution: To achieve this, the following pipe deviations were required. 225mm and 1200mm sewer deviations, plus the 200mm watermain amplification.

Stormwater On Site Detention

Stormwater On-site Detention

by Louis Panagopoulos on June 15, 2018 Often referred to as on-site detention tanks, (OSD) is now not only compulsory for large scale developments, but also residential builds, renovation construction and developments. Most councils now require new property owners to provide a system that captures rainwater that falls on their property and release it at…

Principal Awarded Fellowship

LP Consulting Principal Awarded Fellowship

by Louis Panagopoulos on May 09, 2018 Our principal engineer Louis Panagopoulos has been awarded a Fellowship by Engineers Australia. LP Consulting is a contemporary engineering consultancy offering specialist expertise and innovative design solutions. Engineering is our passion. And we’re delighted that our pursuit of engineering excellence has been officially recognised. The fellowship marks Louis…